Shearwater Double Kayak

Builder Name:
Mark Nye

On June 17, 2015, Mark and Suzanne Nye launched their Shearwater Double at Silver Springs Florida. The kayak, built from kit by Chesapeake Light Craft, took approximately 135 hours over a six month period. Construction is stitch and glue with sapele deck and okume hull.

'ODENBACH

Builder Name:
Hans van der Zanden, Rik van der Zanden

One-off design
Hull: Plywood 7mm, 8 planks
Deck: Mahogany
Keel: Oak
Maststep: Oak
Spars: Douglas
Bowsprit: Oregon Pine

Sails: Dacron 4 oz, about 12 sq metres

JEMCHUJINA

Builder Name:
Aleksander Kovalenko

Aleksander Kovalenko from Kstovo, Russia (near Nijni Novgorod) built in less than one year Eider from Sam Devlin board.The boat sails now The Volga, the builder is happy. This is his first retirement project.

BLIGH

Year Built:
1980

BLIGH is a classic deep vee sports fisherman designed by C.Raymond Hunt & Assoc Inc. Boston, Massachusetts USA in 1979.

LUCIA

Year Built:
1972

Grand Banks Classic 36 ft built in 1972.

THE GROOVER

Builder Name:
Ryan McKeeman

Here we have a 16′ 1956 Dunphy runabout. When I found this gem, she was in an old hay barn sitting on a 1956 TeeNee trailer, hadn’t moved in 15 years. She was a one family boat passed on thru the family.

JLG

Year Built:
1900

14 foot skiff. She was built by the Skaneateles Boat and Canoe Company at the turn of the century. Cedar on steam bent oak ribs. Lapstrake.This beautifully constructed and superbly maintained boat is a wooden boat collectors item: Skaneateles Wooden Boat Show/Clayton Boat Museum quality.

COLNETT

Year Built:
1924

COLNETT is a 42′ motor cruiser which was built in 1924 by Seacraft Corp. in Wilmington, CA. She was built for Mr. Henry Vaughn, with sea trials and commissioning extending into early 1925. She was constructed to Edson B. Schock design #307.

SCHERZO

Year Built:
2015

This 14-foot Pacific Power Dory was built over 4 years. The hull design is the Seneca Power Dory by Jeff Spira. It was built by Murray Walker with help from his friends, Alex Johnson and Tom Hostetler.

Big Brother

Builder Name:
John English

I launched my boat July 27, 2015, I started the build on December 4, 2014. I have 814 hours in the build. The boat performs very Well. I installed a new 70 HP Yamaha 4 stroke outboard with the command link instrument package. The boat reached 29 MPH at 6200 RPM. Getting 5.4 MPG of fuel.