Wittholz 11' Dinghy
Beamy yet fine-lined rowing/sailing boat designed for lightweight construction.
Construction: Cold-molded.
Lofting is optional.
Plans include 5 sheets.
Beamy yet fine-lined rowing/sailing boat designed for lightweight construction.
Construction: Cold-molded.
Lofting is optional.
Plans include 5 sheets.
An oceangoing V-bottomed auxiliary with accommodations for four to six people.
Construction: Carvel planked over sawn frames.
Alternative construction: Plywood (plans included).
Lofting is required.
Plans include 15 sheets.
V-bottomed cruiser designed for plywood construction with accommodations for two and inside ballast.Construction: Plywood planking over sawn frames.Lofting is required.Plans include 11 sheets.Please note: gaff rig version’s mast measurements are taken by scaling from the plans.Notice the below de
V-bottomed seaworthy pocket daysailer/cruiser designed for plywood construction...
Round-bottomed, outside-ballasted cruiser with accommodations for two.Construction: Carvel planked over steamed frames.Alternative construction: Strip.Lofting is required.Plans include 4 sheets.Please note: plans call for an engine long ago discontinued.You'll want to find a suitable alternative.
The latest in Bill Garden’s idea of the perfect kid’s cruising boat. Simple enough to be put together in the garage, salty enough to daydream on, and safe enough as well. She’s quite a handsome double-ender, with a fixed keel. This is an “oh my” boat.Construction: Plywood planking over sawn frame
A handsome daysailer based on the Herreshoff Fish Class, but with a centerboard conversion similar to that of the Haven 12 1/2.
Construction: Carvel planked over steam-bent frames.
Lofting is required.
Plans include 6 sheets.
Speed, good looks, and comfortable seating were the designer's main criteria for this double-ended centerboard daysailer.
Construction: Cold-molded over strip-planked inner skin.
Alternative construction: Strip, carvel planked (transom stern).
Lofting is required.
Fine boatyard skiff or small harbor ferry. Construction: Plywood planking over bulkheads. Lofting is required. Plans include 4 sheets.
Construction: Glued lapstrake plywood.
Alternative construction: Traditional plank, cold molded and strip plank.
No Lofting required.
Plans include 10 sheets.